All Notes (2)
Created by: kerfoot @ 2023-04-08 11:32:22Informational
bios_jack mission #30
Slocum G2 1000m
OS 8.2
Payload Bay #1230
CTD #9415 cal’d 05-Oct-2021
FLBBSLC #4783 cal’d 23-Nov-2022
Aanderaa Optode model 4831 SN #408 cal’d 21-Nov-2018
2-pt cal applied in lab
RSI MicroRider MR SN #231; equipped with 2-FP07 Thermistors and 2 Shear Probes; probes Factory cal’d 2022-11
Created by: kerfoot @ 2023-04-08 11:30:59Operations
Deployed 06-Apr-2023 by JChapman off St. David’s Island, Bermuda