Deployment NameGliderProjectDeployedRecoveredDaysDistancePayload BayOSNotes
bios_jack-20190917T0240bios_jackBIOS2019-09-17
02:40Z
2019-10-21
15:36Z
34.5570.9 km94158.30

All Notes (4)

Created by: rcurry @ 2019-10-23 14:39:59Informational

Vehicle recovered by Goodrich aboard Atlantic Explorer. End of mission 15.

Created by: rcurry @ 2019-09-20 11:41:43Operations
Modified by: rcurry @ 2019-09-20 11:45:44

Hurricane Humberto passed ~100 miles to the north of Bermuda on 18/19 Sep. Glider was set to minimize surface time: double yos, 900m dives, no comms 9 hours, on surfacing get a GPS fix and dive immediately. Transmission of SBD/TBD files resumed on 20 Sep.

Created by: kerfoot @ 2019-09-18 13:41:58Operations

Deployed by C.Goodrich from Atlantic Explorer at BATS on 17-Sep-2019 (UTC)

Created by: kerfoot @ 2019-09-18 13:41:27Informational
Modified by: kerfoot @ 2019-09-18 13:41:42

Software release 8.3
Payload Bay #1230
FLBBCD #4783 factory cal 13-Jul-2017
CTD #9415 factory cal 13-Aug-2017
OPTODE #565 factory cal 22-Jun-2018; 2-pt cal in lab 24-Jul-2019
BSI PAR #50251

POC: R.Curry, C.Goodrich