Deployment NameGliderProjectDeployedRecoveredDaysDistancePayload BayOSNotes
ru28-20140815T1405ru28NJDEP2014-08-15
14:05Z
2014-09-05
12:26Z
20.9495.1 km01037.13

All Notes (11)

Created by: dkaragon @ 2015-07-14 10:52:39Informational

CTD cell cracked during mission

Created by: dkaragon @ 2015-07-14 10:52:28Informational

CTD cell cracked during mission. Unsure of when.

Created by: dkaragon @ 2014-09-05 09:16:36Informational

Recovered by Haldeman out of Belmar/Shark River aboard DEP vessel.

Created by: haldeman @ 2014-09-05 06:48:19Informational

1/2 hour surfacings for recovery

Created by: haldeman @ 2014-08-28 13:55:03Informational

Adjusting u_reqd_depth_at_surface to 1.5 to try and keep gps off.

Created by: haldeman @ 2014-08-26 08:20:36Informational

Turning around at next waypoint and heading back north along the line for a few days as per Bob Schuster. Will pick up new goto at next surfacing. Should clarify if that path is acceptable or if he would rather work straight north then south along the line.

Created by: dkaragon @ 2014-08-23 14:43:37Informational

Going around AC fish haven with intermediate waypoint.

Created by: haldeman @ 2014-08-15 14:31:36Informational

Back on RU dockserver; will need to grab a few files from Webb's dockserver. Switching to 2 hour missions at full depth.

Created by: haldeman @ 2014-08-15 13:35:31Informational

Deployed by Nilsen S. and Katie T. off NJDEP vessel. Dockserver meltdown had gliders switching to Webb; still need to recover some files from there.

Created by: dkaragon @ 2014-07-17 11:22:04Informational

CTD 103P
FLBBCD 2797
Optode SN970
VMT SN 1144951
ID 28376

Created by: dkaragon @ 2014-07-17 11:18:46Informational

Software 7.14