Fleet Configurations
Deployments
Gliders
Projects
Payload Bays
Instruments
Users
API
Log In
Deployment maracoos_02-20220420T2011
Pilot Notes
BATTERY Pack for this mission: pH Coulomb counter reset to 0 before deployment. It looks like it was checked the day of deployment for a total of 225 AH (by battery). This charge attempt didn't appear to work (assuming it was charged). Some of the cells were at 95%. Some of the low cells were part of the disconnected charge cable register, but not all of them. The previous charge attempt a week prior had it to a total of 231 AH The glider reported 167 AH used at recovery. Avg power usage was about 6 AH/day Voltage curve hard to read, it fell quickly in beginning, had an early knee, and then straightened out at the end. If I had to guess 35 days at nominal drain. Recovered at 28/35 = 80% 167/225 = 74% To match 74% total deployment would have to be 38 days. Don't think that would happen. 241 AH total by battery at first pH mission 2019, this one said 231, so if you belive that we are down about 4%
Category
Informational
Alert
Action Needed
Action Taken
Operations
Update
Credentials Required
Username
Password