Fleet Configurations
Deployments
Gliders
Projects
Payload Bays
Instruments
Users
API
Log In
Deployment ru32-20221102T1720
Pilot Notes
Leak was from thruster port on aft cap, not the optode port. Thruster port was also recently upgraded - and is missing a peek adaptor between the end cap and thruster bulkhead. Confirmed with TWR. Similar situation to the optode bulkhead leak on RU26. Thruster bulkhead removed and replaced with an MS vacuum plug, so that RU32 can be redeployed.
Category
Informational
Alert
Action Needed
Action Taken
Operations
Update
Credentials Required
Username
Password