Deployment NameGliderProjectDeployedRecoveredDaysDistancePayload BayOSNotes
bios_jack-20230626T1423bios_jackBIOS-SCOPE2023-06-26
14:23Z
2023-07-28
21:10Z
32.3466.8 km94158.20

All Notes (3)

Created by: kerfoot @ 2023-07-05 05:23:09Informational

Supported by Simons Foundation International, this mission will measure CTD, O2, chlorophyll fluorescence, backscatter, and PAR in support of the BIOSSCOPE cruise scheduled for July 15-19 aboard R/V Endeavor. The glider will profile to 550 m near the ship’s position to obtain temporal resolution suitable for resolving diel cycles.

Created by: kerfoot @ 2023-07-05 05:22:56Informational

Slocum G2 1000m
TWR software version 8.2
Payload Bay #1230
CTD #9415 factory cal’d 05-Oct-2021
FLBBCDSLC #4783 factory cal’d 23-Nov-2022
Aanderaa Optode model 4831 SN 408 ; factory cal’d 21-Nov-2018 ; 2-pt cal applied in lab prior to mission
BSIPAR SN 50251; factory cal’d in 2016 (BSI no longer exists)

Created by: kerfoot @ 2023-07-05 05:22:30Operations

Jonny deployed Jack this morning from R/V Stommel just offshore of the island. We anticipate a 2-month mission. The glider will be profiling in concert with the AE before, during and after the BIOS-SCOPE cruise in mid-July.