All Notes (6)
Anna recovered briefly on 21-Oct for a calibration cast (glider+SUNA strapped to ship's CTD/rosette package). Redeployed on 23-Oct at same site.
Adjusted pump to -260 /+105 to equalize dp/dt: 13 cm/s (dive), 18 cm/s (climb)
Lost starboard wing on 21 Sept. Adjusted pump to -240/+125 to compensate buoyancy.
Hurricane Humberto passed ~150 miles to the north of deployment location on 18/19 Sep. Glider was set to minimize surface time: double yos, 900m dives, no comms 9 hours, on surfacing get a GPS fix and dive immediately. Transmission of SBD/TBD files resumed on 20 Sep.
deployed 10-Sep-2019 by Goodrich on AE for Glider Exports Experiment
Software version 8.3
PAYLOAD BAY #1163
CTD #9263 factory cal’d 19-Jul-2018
FLBBCD #3778 factory cal’d 27-Jul-2018
OPTODE #279 factory cal’d 14-May-2018
SUNA #708 factory serviced Aug-2019
bios_anna POC: Goodrich / Curry