Deployment NameGliderProjectDeployedRecoveredDaysDistancePayload BayOSNotes
bios_anna-20190910T1222bios_annaBIOS2019-09-10
12:22Z
2019-10-21
13:50Z
41.1708.0 km92638.30

All Notes (6)

Created by: rcurry @ 2019-10-23 14:38:30Informational

Anna recovered briefly on 21-Oct for a calibration cast (glider+SUNA strapped to ship's CTD/rosette package). Redeployed on 23-Oct at same site.

Created by: rcurry @ 2019-09-22 09:46:46Operations

Adjusted pump to -260 /+105 to equalize dp/dt: 13 cm/s (dive), 18 cm/s (climb)

Created by: rcurry @ 2019-09-22 09:33:15Operations

Lost starboard wing on 21 Sept. Adjusted pump to -240/+125 to compensate buoyancy.

Created by: rcurry @ 2019-09-20 11:44:29Operations
Modified by: rcurry @ 2019-09-20 11:45:24

Hurricane Humberto passed ~150 miles to the north of deployment location on 18/19 Sep. Glider was set to minimize surface time: double yos, 900m dives, no comms 9 hours, on surfacing get a GPS fix and dive immediately. Transmission of SBD/TBD files resumed on 20 Sep.

Created by: kerfoot @ 2019-09-18 13:43:21Operations

deployed 10-Sep-2019 by Goodrich on AE for Glider Exports Experiment

Created by: kerfoot @ 2019-09-18 13:43:00Informational
Modified by: kerfoot @ 2019-09-18 13:43:32

Software version 8.3
PAYLOAD BAY #1163
CTD #9263 factory cal’d 19-Jul-2018
FLBBCD #3778 factory cal’d 27-Jul-2018
OPTODE #279 factory cal’d 14-May-2018
SUNA #708 factory serviced Aug-2019

bios_anna POC: Goodrich / Curry