Deployment NameGliderProjectDeployedRecoveredDaysDistancePayload BayOSNotes
ru21-20100319T1455ru21MURI2010-03-19
14:55Z
2010-04-12
19:42Z
24.2597.9 km01216.37

All Notes (13)

Created by: dkaragon @ 2010-04-13 11:24:46Informational

Recovered aboard RV Caleta out of Parlin, NJ
Aboard Haskins, Captain Ken

Returned to Tuckerton and picked up by Ethan in CODAR van out of Brigantine

Created by: dkaragon @ 2010-04-10 07:51:37Informational

setting up ping pong
science might be turned off sometime today. once we near 11.5 V

put on no waypoint surfacing mission

Created by: dkaragon @ 2010-04-05 23:01:17Informational

u_min_water_depth back to 0 m!

Created by: dkaragon @ 2010-04-01 15:58:17Informational

turning to offshore ELINE waypoint, currents and battery say turn it, so I am.

Created by: kerfoot @ 2010-03-26 11:31:55Informational

Prepped by Haskins for MURI run.
Deployed by Kahl and Jakubiak on the Lucky Lady.

Created by: kerfoot @ 2010-03-25 10:34:18Informational

restarted mission for no_comms to take
sampling appears OK so allowing 3 hour missions again

Created by: dkaragon @ 2010-03-25 07:56:54Informational

bumping sampling rate on sensors... see how she does for 1 or 2 segments...

1 sec sampling across the board

Created by: dkaragon @ 2010-03-25 07:50:40Informational

set u_min_water_depth 30 m

wed 3/24 10 pm est

Created by: dkaragon @ 2010-03-24 17:14:58Informational

Need to set u_min_water_depth to 30 m

Glider is hanging up often on file transfers. I have noticed this with RUDICS, may have to approach them to see what issue could be.

Changed missions to 2 hours to try and have the glider catch up and more surfacings to fix the altimeter problem.

Created by: kerfoot @ 2010-03-23 21:24:27Informational

Back to normal routine:

yo10.ma: set climb to depth to 5m
surfac20.ma: set timeout to 3hrs
surfac40.ma: set no comms to 4hrs

sbd x 3 xml script on.

Created by: kerfoot @ 2010-03-23 08:38:34Informational

Retasked to swim underneath the shipping lanes running south of Long Island, NY:

yo10.ma - climb to depth set to 20m
surfac20.ma - timeout set to 12 hrs (43200 seconds).
surfac40.ma - no comms set to 13 hours (46800 seconds).
goto_l10.ma - waypoint set to point south of both shipping lanes.

^R script running.

Created by: kerfoot @ 2010-03-19 09:47:03Informational

Payload:
ctd-121
bam-026g
bb3slo-645
bbfl2s-667

Created by: kerfoot @ 2010-03-19 09:46:01Informational

RUDICS