Fleet Configurations
Deployments
Gliders
Projects
Payload Bays
Instruments
Users
API
Log In
Deployment ru29-20130111T0724
Pilot Notes
System reset at Wed May 15 13:30:33, glider ran initial.mi underwater and surfaced for the initial mission surfacing. Due to 7.9 bug and bug applicable mission file, initial.mi, glider ran yo loop until aborting 2013-05-25T06:51:52 for GPS. Did not pull any log files, the smallest was 2 MB. Power usage was ~ 50 days at 2.5 AH/day, or 125 AH.
Category
Informational
Alert
Action Needed
Action Taken
Operations
Update
Credentials Required
Username
Password