Fleet Configurations
Deployments
Gliders
Projects
Payload Bays
Instruments
Users
API
Log In
Deployment ru25d-20110103T1405
Pilot Notes
Power Budget: ru25d \'10-11 Palmer Season Deployment 1: 51 AH at 12.7 V, 12.7 V extrapolated at 57.6% battery life using history of curves total AH = 89 ru25d \'09-10 Palmer Season Deployment: 86 AH @ 12.2 V, 12.2 V extrapolated at 71% using battery life curves total AH = 121 (high because we drifted) ru16 NJDEP: 116 AH @ 12.05 V ==> 140 AH total estimated Theoretical (from Duracell): 5.65 AH * 23 = 130 AH Temperature effect (from Duracell): 21 C --> 0 C = 71% 21 C --> -10 C = 50% ~ 2.1% per deg C ==> ~ 70 % for ru25d 135 AH average (theoretical vs \'10-11 deployment 1) 135 AH 8 .7 = 94.5 AH lets say 92 AH because we don\'t know what was used in lab edit- updated the theoretical number by 5% due to ru25d burning less battery. Overall change is small, < 2 ah.
Category
Informational
Alert
Action Needed
Action Taken
Operations
Update
Credentials Required
Username
Password