Fleet Configurations
Deployments
Gliders
Projects
Payload Bays
Instruments
Users
API
Log In
Deployment ru26d-20190905T1802
Pilot Notes
2 segments of 25% thruster, low power mode still off, before moving on to PMEL mooring. Strongest currents we may see so figured I should test thruster. MissionSTARTDate: 03 Dec 2019 16:38:31 Z Mission Name: 1K_N.MI Mission Number: ru26d-2019-336-0-0 (0030.0000) Is thruster segment 1, 2 should be 00300002 Vertical velocities went up by about 5 cm/s each on dive and climb @ 25% thrust. power still needed to be calculated.
Category
Informational
Alert
Action Needed
Action Taken
Operations
Update
Credentials Required
Username
Password