Fleet Configurations
Deployments
Gliders
Projects
Payload Bays
Instruments
Users
API
Log In
Deployment ru30-20221011T1527
Pilot Notes
Lots of corrosion on optode cable, at the optode side. Pins all look clean, but the whole exterior was caked in corrosion. This was a new MCBH to MCBH cable, but the cable likely leaked and needs replacing.
Category
Informational
Alert
Action Needed
Action Taken
Operations
Update
Credentials Required
Username
Password