Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
ru06-65 LTER 2009-12-24
00:15 GMT
2010-01-01
22:30 GMT
8.93 158.0
km
14.64 Volts
12.50 Volts
906
minutes
Haskins
Kahl
Haldeman
4 0139 kmzs

deployment Notes (4)  

Select Category: Deployment Glider All

Posted/
Updated
Category
2010-05-07 16:00 GMT
kerfoot
deployment Upon recovery:

Found water throughout the entire glider. Aft leak appeared dry and no signs of water or salt in the aft cap.

No signs of water or salt on the upper inside of FIRe sensor. 2 small puddles in the bottom of the FIRe sensor.

Leak appears to be from the fore section. Approximately 1/2 cup of water drained out. Fore leak detect sensor soaked.

Diagnosis: pump diaphragm failure.
2010-04-20 17:06 GMT
haskins
deployment Second deployment of RU06 this time with the FIRe sensor. Deployed at Station E and sent to sample the canyon.
2010-03-19 15:55 GMT
kerfoot
deployment Deployed by Haskins, Kahl and Gaas in Palmer boating zone.
2010-03-19 15:55 GMT
kerfoot
deployment Initial Payload:
ctd-153
bb3slo-602
bbfl2s-630

Initial payload replaced with ru24 payload:
ctd-139
FIRe-001

Due to bad digifin on ru24