Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
bios_jack-560 BIOS 2019-05-12
15:07 GMT
2019-05-16
12:35 GMT
3.89 27.2
km
11.02 Volts
11.21 Volts
242
minutes
Williams
Goodrich
Curry
5 ?

deployment Notes (5)  

Select Category: Deployment Glider All

Posted/
Updated
Category
2019-05-17 11:43 GMT
anything
deployment Recovered by AE on 16-May-2019. uRider nose had flooded. Returning to lab for assessment/repairs.
2019-05-15 15:43 GMT
anything
deployment Last yo shows vehicle is gaining mass (faster dive, slower climb). Now drifting on surface: u_max_time_in_gliderdos 3600; callback 30
Recovery scheduled for tomorrow a.m.
2019-05-15 13:38 GMT
anything
deployment Climb speeds decreased significantly to 10-12 cm/s on last yo bios_jack_2918_131-2-0 (01670000). Possible leak or sargassum weed caught around probes. Suspect latter (T1,T2 both deteriorated yesterday. Will grab on next surfacing for further evaluation and possile recovery tomorrow a.m.
2019-05-15 13:31 GMT
anything
deployment Unrecognized uRider messages triggered errors in version 8.2 proglet. Default num_errs parameter in urider.ini is zero, which led to science-super errors accumulating. Changed num_errs to 31000 (10 probably sufficient)to solve the problem. No uRider data collected until 14-May.
2019-05-13 15:40 GMT
kerfoot
deployment bios_jack deployed 12-May-2019 at BATS by Atlantic Explorer
PB #1230
CTD #9415
FLBBD #4783
Optode #565
MicroRider #273
OS 8.2, not 8.1