Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
ru28-521 NJDEP/EPA 2017-09-15
14:16 GMT
2017-10-03
13:05 GMT
17.95 303.8
km
15.37 Volts
12.20 Volts
2431
minutes
Aragon
Waite
Fisheries
18 0103 kmzs

deployment Notes (18)  

Select Category: Deployment Glider All

Posted/
Updated
Category
2017-10-18 19:09 GMT
dkaragon
deployment SVS clock sync was + 13 sec vs GMT time on 10/18/2017

SYSTEM TIME: 19:08:03 10/18/2017
GMT from website 19:07:50
2017-10-03 13:10 GMT
waite
deployment recovered by Chip and Joe on NJDEP boat out of Atlantic City.
2017-10-01 21:19 GMT
waite
configuration retasked to head back in shore towards recovery location
2017-09-26 16:28 GMT
waite
deployment turning wave sensor on for 1 segment each day.
2017-09-25 17:26 GMT
waite
deployment svs off. Heading back inshore to resume the NJDEP sampling line.
2017-09-23 03:58 GMT
waite
deployment CC on. Station keep south of Barnegat Buoy. Wave sensor back on.
2017-09-22 20:59 GMT
dkaragon
deployment LISST to -6 every 6th, optics just downcast
2017-09-22 01:17 GMT
dkaragon
deployment LISST every 3rd yo, CC off moving towards Barnegat buoy. May change optics to just downs, perhaps LISST to every 6th yo.
2017-09-20 23:12 GMT
dkaragon
deployment Station keep for storm
2017-09-19 23:24 GMT
dkaragon
deployment svs settings from deployment, checked today (note time)

Time 23:10:10 9/19/2017

IDENTITY SVS-603

VOLTAGE 15.21

VERSION 1.7

BAUDSER 9600

AVR 33

INTERVAL 10101

TSTEP 0.3333

COFF 20.00

EFRAMEXY 1

EFRAMEZ 1

MAGHEADING 0

DANG 0.00

OFFSETZ 0.00

OUTPUTUSB 0000

OUTPUTSER 00FE

LOG 07

POLLING 0

SPECUSB 0

SPECSER 0

RECAL 1

SUMMARYUSB 0

SUMMARYSER 1

RESETCOUNT 72

DIRAVRFAC 1
CALSTATUS 3313
SD CARD READY
OUTPUTUSB HEADER:
NO OUTPUT
OUTPUTSER HEADER:
2017-09-19 20:33 GMT
dkaragon
deployment Surface test inconclusive, not enough density in data.

Theory is maybe it climbed super steep and that caused a pitch battery stuck condition.
2017-09-19 20:17 GMT
dkaragon
deployment Backed off to 5.5 m off bottom, think wave action caused some sample events.
2017-09-19 02:05 GMT
dkaragon
deployment Wave sensor turned on roughly 12 to 11 est.
2017-09-18 13:44 GMT
dkaragon
deployment We found fin, lisst, vmt, are vertical at attitude_rev = +3 deg roll.
2017-09-15 23:07 GMT
dkaragon
deployment We found fin, lisst, vmt, are vertical at attitude_rev = +3 deg roll.
2017-09-15 19:36 GMT
dkaragon
deployment 2 hour missions

SVL off

2017-09-15 15:46 GMT
dkaragon
deployment Deployed by Josh, Nicole, Christian, Tony aboard NJDEP vessel out of Belmar.

initial 10 min mission, no accel, 2nd 10 min mission, accel turned on.

loadmission ru28.mi
2017-09-15 15:43 GMT
dkaragon
configuration GPCTD 103P
FLBBCD 2797
OPTODE 3835 SN 971 (previous optode cable failed, noticed in lab)
LISST SN 01
SVS603 SN ?? (00?) Firmware 1.7
VMT SN 1144951