Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
bios_minnie-501 BIOS 2017-02-20
12:29 GMT
2017-05-29
16:57 GMT
98.19 891.5
km
11.03 Volts
10.89 Volts
2744
minutes
Aragon 16 9265 kmzs

deployment Notes (16)  

Select Category: Deployment Glider All

Posted/
Updated
Category
2017-05-21 11:34 GMT
anything
deployment Turned off science sensors except for CTD. Heading north to Hydrostation for pickup next week by AE.
2017-05-17 15:28 GMT
dkaragon
deployment Would be good post deployment to check the bad GPS hit DBD/MLG.
2017-05-13 14:08 GMT
dkaragon
deployment Underwater reset = m_why_started = 32 software watchdog
appeared to happen as nearing the surface

reloaded minnie.mi

resequenced 1k_n2.mi x 5
2017-05-09 13:11 GMT
anything
deployment put u_alt_min_depth 1500
put u_low_power_cycle_time 30
2017-05-06 21:19 GMT
anything
deployment Increased no comms to 9 hours
2017-05-06 11:38 GMT
anything
deployment Increased pump to -200 / +210
2017-05-05 10:43 GMT
anything
deployment Dialed pump throw back: -175 / + 185
2017-04-19 10:25 GMT
anything
deployment Full pump throw to make way against strong currents
2017-03-28 13:36 GMT
dkaragon
deployment Bad GPS hit, ru29 had one a few weeks ago...
2017-03-25 11:49 GMT
anything
deployment Science unable to send files (all 3 gliders experienced this on same day)

Fixed by cycling power on science side
put c_science_on 0
put c_science_on 1
2017-03-23 07:59 GMT
anything
deployment Reduced pump throw to -175 / +185 as currents have abated.
2017-03-23 01:19 GMT
dkaragon
deployment Bad GPS hit, ru29 had one a few weeks ago...
2017-03-19 17:33 GMT
anything
deployment Back to full pump throw to deal with strong currents 35 cm/s
2017-03-19 17:33 GMT
anything
deployment Sampling changed:
CTD: d/c/h
OXY4,FLBB: d/h
SUNA: c/h

normal size SBD files now
2017-03-19 17:33 GMT
anything
deployment Pump throw -200/+200
changed tbdlist to reduce size
Reduced waypoint radius to 50 m (was erroneously set to 5000!)
CTD pressure biased +3 m greater than m_pressure (also in previous missions)
2017-03-19 17:33 GMT
dkaragon
deployment Deployed by R/V Endeavor at BATS site
software version 7.20
CTD 9265
FLBB 3771
Optode 541
SUNA 708