Glider Status

ID Project Deployed Last Call Hours Ago Location # Days Distance Waypoint Range Battery Vacuum POC Notes
bios_anna-500 BIOS 2017-02-20
17:57 GMT
2017-04-27
02:23 GMT
4:52
hours
32°07.69'N
64°29.29'W
65.4 374.3
km
32°07.70'N
64°28.50'W
1.2
km
11.08
Volts
9.2
inHg
Aragon 7

deployment Notes (7)  

Select Category: Deployment Glider All

Posted/
Updated
Category
2017-04-17 15:32 GMT
dkaragon
deployment Pump oil passive retraction started on this mission, perhaps slightly on last mission after reading notes.

Roughly 7k tot num inflections
2017-03-25 11:48 GMT
anything
deployment Experienced bug (same day as other 2 gliders)
DRIVER_ODDITY:science_super:906:Input ringbuf overflow

Fixed by cycling power on science side
put c_science_on 0
put c_science_on 1
2017-03-19 15:04 GMT
anything
deployment put u_alt_min_depth 1500
put u_low_power_cycle_time 30

sent all *sbd (there was a backlog -- Fast Script TBDSBD not giving enough time at surface for sending logs-??)

goto file set to 0.5 km box at Hydro
2017-03-19 15:04 GMT
anything
deployment pump throw -130 / +210
changed initial waypt to -1 (first after last)
sci sampling on dives only
2017-03-19 15:04 GMT
anything
deployment pump throw -130 / +210
sci sampling on dives only
initial waypoint -1 (first after last, in goto)
2017-03-19 15:04 GMT
dkaragon
deployment Deployed by R/V Endeavor at Hydrostation S
software version 7.20
CTD 9136
FLBBCD 3409
Optode 279
2017-03-19 15:04 GMT
dkaragon
deployment test