Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
bios_minnie-461 BIOS 2015-09-17
13:54 GMT
2015-10-09
17:00 GMT
22.13 428.6
km
11.14 Volts
11.22 Volts
914
minutes
Aragon 19 0000 kmzs

deployment Notes (19)  

Select Category: Deployment Glider All

Posted/
Updated
Category
2016-05-09 15:03 GMT
dkaragon
2016-05-09 15:10 GMT
dkaragon
configuration VER 7.18
CTD 9265P
OXY4 SN 417
FLBBSLC-3771
SUNA 642
2016-05-03 19:04 GMT
dkaragon
configuration Software version 7.18 (last 2 missions)
2015-11-05 21:50 GMT
dkaragon
deployment Noticed several 'overdives' during course of mission. Need to investigate.
2015-10-12 12:28 GMT
dkaragon
deployment Recovered 1pm 10/9 EST by Ruth Curry aboard Yellow Two PITS Spar
2015-10-08 23:12 GMT
dkaragon
deployment Glider aborted for weight drop. Currently drifting.

MLG and MBD point to oil not being pumped out for 100 m beyond turn point. Weight shot, eventually oil pumped out. Need to email Webb regarding.

max_time_in_gliderdos set to 8 hours
2015-10-08 13:59 GMT
rcurry
deployment increased no_comms to 10 hours
2015-10-07 18:07 GMT
rcurry
deployment changed to double yos
no comms after 8 hours
2015-10-06 14:28 GMT
rcurry
2015-10-06 14:30 GMT
rcurry
deployment Changed:
no_comms to 8 hours
keystroke wait time to 599
u_iridium_failover_retries 10
single yos
u_max_time_in_gliderdos 600

downloaded all *.sbd *.tbd

running 1k_n2.mi
Fast Script development
2015-10-05 00:48 GMT
dkaragon
deployment Ran 1k_nu mission for 30 hour overtime, 24 hour nocomms, 240 sec nothing commanded surfacing and 13:00 UTC each day
2015-10-04 14:40 GMT
dkaragon
deployment Changed:
backup number to TWR phone_num_alt 17818711051
failover retries 3
2015-10-03 19:30 GMT
rcurry
deployment Abort for device error: pitch motor became stuck with battpos at ~0.1 ; Took pitch_motor out of service for now. Adjusting pump throw to -200/ +160 to reduce climb speed.
Surface conditions are rough (seas running 10 ft)
Hurricane warning now posted for Bermuda, Joaquin to pass island Sunday evening (4 Oct).
2015-09-28 11:40 GMT
rcurry
deployment Turned altimeter off
2015-09-28 00:11 GMT
dkaragon
deployment BIOS internet went down, failover was Rutgers and phone lines to modems were still connnected. Disconnected at around 5 EST
2015-09-26 14:31 GMT
dkaragon
deployment Changed u_reqd_depth_at_surface to 4 m
2015-09-23 06:44 GMT
rcurry
deployment set to double yos; pump throw +/- 200 cc
2015-09-18 18:56 GMT
dkaragon
deployment VER 7.18
CTD 9265P
OXY4 SN 417
FLBBSLC-3771
SUNA 642 (reference performed 9/16/2015 using BIOS left tube milli Q machine)
2015-09-18 18:47 GMT
dkaragon
deployment Since near deployment fin deadband set to .04 radians vs .02. Numerous OOD oddities at surface.
2015-09-18 18:46 GMT
dkaragon
deployment Changed TBD from 12 sec sampling to 45 second
Changed SBD to less diagnostics on pump

Suna OFF upcasts

.bin files being created at 70 KB/3 hours
2015-09-18 13:04 GMT
rcurry
deployment Waypts set to BATS box