Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
bios_anna-414 BIOS 2014-06-24
14:32 GMT
2014-10-02
11:28 GMT
99.87 2204.1
km
11.33 Volts
10.97 Volts
6382
minutes
Aragon 17 9136 kmzs

deployment Notes (17)  

Select Category: Deployment Glider All

Posted/
Updated
Category
2017-02-02 15:16 GMT
dkaragon
deployment CTD SN 9136
FLBBCD 3409
OXY4 SN 279
2014-10-02 14:50 GMT
dkaragon
deployment Recovered by Ruth Curry aboard RV Stommel out of BIOS.
2014-10-01 19:29 GMT
dkaragon
deployment Back into recovery zone, +- 1000 cc full speed single yo's
2014-09-30 13:56 GMT
dkaragon
deployment Abored recovery due to bad weather, headed glider back out to Hydrostation S.

-125 / 1000 cc single yo's to 1km
2014-09-26 15:13 GMT
dkaragon
deployment Changed mission to 1k_n2 so no more waypoint surfacings.

u_alt_min_depth back to 2 m, altimeter should be turning on.
2014-09-24 18:14 GMT
dkaragon
deployment Back to full speed, double yo's (get home for recovery)
2014-09-12 20:47 GMT
dkaragon
deployment Double yo's
-125 / +1000 cc
2014-09-01 19:24 GMT
dkaragon
deployment Double yo's to help combat currents.
2014-09-01 13:54 GMT
dkaragon
deployment Full speed +-1000 cc, fighting currents.
2014-08-25 11:34 GMT
dkaragon
deployment Glider slow down 15 cm/s
-137 / +238 cc
965 m dive to
2014-08-22 22:11 GMT
dkaragon
deployment Enabled low power mode (30 s) and u_alt_min_depth 1100
2014-08-22 16:33 GMT
dkaragon
deployment Saved about 15% power.
2014-08-18 17:11 GMT
dkaragon
deployment Shortened SBDlist a little, maybe 20%

Turned off FLBBCD for ascents, optode still to be determined.
2014-08-18 15:59 GMT
dkaragon
deployment Underwater reset, 8/15, resequenced
2014-07-02 16:25 GMT
dkaragon
deployment Changed buoyancy pump throw to begin to equalize dive and climb speeds.

From +-260 cc to -195 / +260
2014-06-27 12:41 GMT
dkaragon
deployment Flying to 950 m, full pump throw, optics are now off past 400 m.

Tightened up the SBD and TBD for smaller transfer size.

Flying in 12 km leg hourglass around HYDRO S.
2014-06-27 12:39 GMT
dkaragon
deployment Deployed by Ruth Curry & David Aragon off RV Atlantic Explorer.