ru28-391 GP2013 2013-09-12
16:50 GMT
2013-10-24
10:51 GMT
41.75 696.9
km
10.89 Volts
10.79 Volts
5243
minutes
Haldeman
Aragon
14 0057 kmzs

deployment Notes (14)  

Select Category: Deployment Glider All

Posted/
Updated
Category
2013-10-16 14:49 GMT
dkaragon
deployment No rendezvous, will run across shelf transects between shoals looking for sharks. Changed climb angle to 30 degrees to see if we can speed the glider up. Back to 2 hour surfacings.
2013-10-14 13:23 GMT
dkaragon
deployment Turned CC off to get closer to shore.
2013-10-10 12:45 GMT
dkaragon
deployment Repeating overdepth aborts. Glider too heavy combined with wave action.

Ran out of sequence and ran lastgasp last night.
2013-10-02 19:37 GMT
dkaragon
deployment Trying f_fin_safety_max .3

Changed the SBDlist to have more heading error and fin data including c_fin
2013-10-02 16:00 GMT
dkaragon
deployment Some digifin problems. Aborts for fin. Unreliable behavior, commanded to 0, reaches 0, then all the sudden is measured at .2 radians.

Also seemed reliable at .1 safety limit. .2 seemed OK too.
2013-09-25 13:34 GMT
haldeman
deployment Changing target altitude from 2.5 to 3 m; trying to avoid overdepth abort
2013-09-20 18:40 GMT
dkaragon
deployment Trying - 150 cc dives to slow the glider down a bit
2013-09-20 18:13 GMT
dkaragon
deployment POWER ESTIMATES:
(used ru26d 2012/2013 LTER pack)
40% used LTER
6 % used self-discharge
5 % OTIS factor (voltage drop occurs about 5% before rated end of life)
---
~ 51% used

This deployment has potential for 728 AH, but at 51% used that only leaves 357 ah available.

m_coulomb_amphr was not reset, but started at about 112 AH, therefore this deployment EOL = 112 + 357 = 469 AH.
2013-09-17 01:19 GMT
dkaragon
deployment Glider a bit heavy, so dive to pump -180 cc to try to slow the dives down a bit, overshooting m_water_depth which is working so far (but we should figure out why). Might help with O2 data too.
2013-09-15 02:55 GMT
haldeman
deployment u_reqd_depth_at_surface 1.5; climb=to to 3 m.
2013-09-13 13:30 GMT
haldeman
configuration Lithium batteries; RU26d LTER pack.

NOTE: Alkaline batteries cannot be reinstalled until optode voltage regulator board is replaced and science bay is reconfigured, otherwise voltage may destroy optode.
2013-09-13 13:28 GMT
haldeman
deployment Manually transferred files. Web processing should catch up. Switched to 2 hour surfacings.
2013-09-12 17:19 GMT
Haldeman
configuration Software version 7.13 CTD 0057P FLBBCD 2797 Optode sn 1504
2013-09-12 17:18 GMT
Haldeman
deployment Software version 7.13 CTD 0057P FLBBCD 2797 Optode sn 1504 Externally mounted Vemco receiver

Deployed by Travis Miles out of Shark River on DEP vessel