Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
ru10-339 eline 2012-03-23
16:38 GMT
2012-04-10
15:57 GMT
17.97 341.4
km
13.87 Volts
10.80 Volts
1517
minutes
Aragon
Haskins
Haldeman
15 0036 kmzs

deployment Notes (15)  

Select Category: Deployment Glider All

Posted/
Updated
Category
2012-04-10 18:33 GMT
dkaragon
deployment Recovered ~ 8 nm offshore by Tina Haskins, Kaycee Coleman, Filipa C., aboard RV Arabella.

Go Pro footage of recovery might exist.
2012-04-10 03:03 GMT
dkaragon
deployment Speeding glider back up a bit to get closer.
2012-04-10 02:15 GMT
Haldeman
deployment Turned off file transfers for the night to try to reach A2 (recovery position)
2012-04-09 19:11 GMT
Haldeman
deployment Wpt changed to bring glider into Tuckerton; 2nd wpt ~1 km north. Recovery tomorrow a.m.
2012-04-08 14:45 GMT
dkaragon
deployment Science is off, pump throws decreased to save power.
2012-04-02 13:18 GMT
dkaragon
deployment CTD on all but surface, glider battery responded well to CTD every other & not surface, so will turn it back on more.
2012-03-30 20:33 GMT
dkaragon
deployment Optics every 6th downcast, CTD on every other

Changed waypoint to more south due to currents. Will likely turn the glider around tomorrow morning.
2012-03-26 16:09 GMT
dkaragon
deployment In an effort to save some more power, changing optics to -4, every 4th downcast.
2012-03-26 02:30 GMT
dkaragon
deployment +- 1000 cc
2012-03-24 14:13 GMT
dkaragon
deployment Changed tbdlist to 4 sec sampling all sensors
Changed SBD to delimit sci_water_pressure much more as I think that was the cause of the SBD's being so large.

Hopefully this reduces surface time.

u_pitch_max_delta_battpos .06
2012-03-23 21:25 GMT
dkaragon
2012-03-23 21:25 GMT
dkaragon
deployment +- 180cc, backed off to 5 m below surface, we we're breaching firing up surface devices.
2012-03-23 20:13 GMT
dkaragon
2012-03-23 20:13 GMT
dkaragon
deployment PUCK: 1 sec sampling downcasts, -2 yos (every other, excluding first)
CTD: all the time
2012-03-23 19:22 GMT
dkaragon
deployment Deployed by Tina Haskins, Kaycee Coleman, Shannon Harrison, Dave Kaminksy & students aboard RV Arabella out of Viking Marine.
2012-03-23 18:23 GMT
kerfoot
deployment Student deployment on the Endurance Line
2012-03-23 18:23 GMT
dkaragon
2012-03-23 18:23 GMT
kerfoot
configuration Science Payload:

ctd-0036
bbfl2s-338
bb3slo-796 (bbslk)