Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
ru16-169 NJDEP/EPA 2010-09-24
15:45 GMT
2010-09-26
15:41 GMT
2.00 35.3
km
15.24 Volts
13.86 Volts
222
minutes
Aragon
Haldeman
Haskins
5 0101 kmzs

deployment Notes (5)  

Select Category: Deployment Glider All

Posted/
Updated
Category
2011-01-24 20:15 GMT
dkaragon
configuration 1/24/2011
Optode 972 sent to Aanderaa for re-cal / post cruise check
2010-09-25 22:53 GMT
haldeman
deployment bpump is overheated. 16 is now in drift mode; needs to be recovered.
2010-09-25 22:03 GMT
haldeman
deployment ~17:45 EDT RU16 surfaced for device error, bpump out of service. Put bpump back into service, waiting for callback.

GliderDos A 16 >use + buoyancy_pump

BUOYANCY_PUMP:Putting device BACK INTO SERVICE: BUOYANCY_PUMP
ok
Exiting all devices ...
1118 2 disabling Iridium cons
OK
2010-09-24 20:58 GMT
haldeman
deployment Tx'ed .dbd; all looked well. Immediately sent on 3 hour missions. Dive-to changed to 98 m @ 4:47 EDT surfacing.
2010-08-20 14:58 GMT
kerfoot
configuration Science Payload:

ctd-101
bbfl2slo-600
optode-972