Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
ud_134-144 IOOS 2010-07-02
15:55 GMT
2010-07-27
13:49 GMT
24.91 526.0
km
15.25 Volts
11.05 Volts
2015
minutes
Hails
Currier
Boyes
4 0152 kmzs

deployment Notes (4)  

Select Category: Deployment Glider All

Posted/
Updated
Category
2010-07-27 20:06 GMT
haskins
deployment Upon recovery Cory gave the Blue Hen an exterior inspection and found nothing suspect or wrong. Nothing was covering the optics on the payload bay to cause the error. Will need further diagnosis back in lab.
2010-07-23 15:45 GMT
dkaragon
deployment turned science back on after a day or two for the storm
2010-07-16 18:59 GMT
kerfoot
2010-07-16 18:59 GMT
dkaragon
configuration sci_bb3slo_b532 channel is dead

bb3slo b 532 backscatter seems to have went kaput last mission, and still is on ud_134
2010-05-25 12:00 GMT
kerfoot
configuration Science Payload (on loan from Rutgers):

CTD-152
bb3slo-601
bbfl2-631