Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
ru23-141 IOOS 2010-06-22
20:18 GMT
2010-07-02
18:30 GMT
9.93 188.3
km
12.55 Volts
11.82 Volts
828
minutes
Haldeman
Hails
4 0121 kmzs

deployment Notes (4)  

Select Category: Deployment Glider All

Posted/
Updated
Category
2011-02-04 16:52 GMT
dkaragon
deployment bbsl-645 puck went bad. caused fuse to short in science payload.
2010-12-02 17:15 GMT
kerfoot
configuration Science Payload:

CTD-0121
bbfl2s-667
bb3slo 645
bbam 026G
2010-06-28 18:13 GMT
dkaragon
2010-06-28 18:13 GMT
dkaragon
deployment All,

Some bad news regarding ru23:

The science unexpectedly shut off during the a segment flown: ru23_2010_172_6_83_sbd

Ever since that segment it has not given any data back. This morning I took manual control and tried to control science from the command line but to no avail. Multiple exit resets, use -, use +, unable to consci, and sensor manipulation and it looks like the bay is kaput. The only things I can think of are a power connector or comms cable came loose, or we perhaps popped a fuse with the full science bay? Likely the former.

The glider is turned around and I will email TWR regarding it to see if they have any ideas, but for the time being we are without science and she is flying back to recovery position. Sorry for the news, this is a first for us so its a bummer.

David K. Aragon
2010-06-03 16:13 GMT
kerfoot
configuration Lithium ion rechargeables