Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
ru23-76 eline 2009-09-21
18:13 GMT
2009-10-20
19:19 GMT
29.05 610.6
km
12.00 Volts
12.00 Volts
2872
minutes
Aragon
Haldeman
Kerfoot
5 0000 kmzs

Transects: Synoptic 1 2 3 4 5 6 All Latest

Transect 0: 2009-09-21 18:17 - 2009-10-19 09:56 GMT

Maps

Transect
Transect Map

Cross-Sections: Time-Series

Density (kg m-3) Salinity (PSU) Temperature (°C) Sound Velocity (m s-1)
sea-water-density sea-water-salinity sea-water-temperature speed-of-sound-in-sea-water

Cross-Sections: Distance Along Track

Density (kg m-3) Salinity (PSU) Temperature (°C) Sound Velocity (m s-1)
sea-water-density sea-water-salinity sea-water-temperature speed-of-sound-in-sea-water