Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
ru07-431 NJDEP/EPA 2014-09-18
13:10 GMT
2014-10-09
13:31 GMT
21.01 460.0
km
15.01 Volts
11.71 Volts
2091
minutes
Aragon
Haskins
Haldeman
15 ? kmzs

Transects: Synoptic 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 All Latest

Transect 20: 2014-10-08 23:30 - 2014-10-09 03:33 GMT

Maps

Transect Depth-Averaged Currents
Transect Map uvmap

Cross-Sections: Time-Series

Density (kg m-3) Salinity (PSU) Temperature (°C) Sound Velocity (m s-1)
sea-water-density sea-water-salinity sea-water-temperature speed-of-sound-in-sea-water

Cross-Sections: Distance Along Track

Density (kg m-3) Salinity (PSU) Temperature (°C) Sound Velocity (m s-1)
sea-water-density sea-water-salinity sea-water-temperature speed-of-sound-in-sea-water