Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
amelia-400 GP2013 2013-10-17
17:09 GMT
2013-11-06
15:31 GMT
19.93 455.3
km
14.75 Volts
11.66 Volts
1639
minutes
Gong 2 9092 kmzs

Transects: Synoptic 1 All Latest

Transect 0: 2013-10-18 01:03 - 2013-11-05 22:42 GMT

Cross-Sections: Time-Series

CDOM (ppb) Chlorophyll a (µg L-1) Density (kg m-3) Salinity (PSU) Temperature (°C) Sound Velocity (m s-1)
sci-flbbcd-cdom-units sci-flbbcd-chlor-units sea-water-density sea-water-salinity sea-water-temperature speed-of-sound-in-sea-water

Cross-Sections: Distance Along Track

CDOM (ppb) Chlorophyll a (µg L-1) Density (kg m-3) Salinity (PSU) Temperature (°C) Sound Velocity (m s-1)
sci-flbbcd-cdom-units sci-flbbcd-chlor-units sea-water-density sea-water-salinity sea-water-temperature speed-of-sound-in-sea-water