Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
ru25d-372 LTER 2012-12-18
19:41 GMT
2013-01-28
21:43 GMT
41.09 825.8
km
10.50 Volts
10.76 Volts
3558
minutes
Couto
Carvalho
Haskins
Aragon
15 0156 kmzs

Transects: Synoptic 1 All Latest

Transect 0: 2012-12-18 19:40 - 2013-01-28 16:59 GMT

Maps

Transect Depth-Averaged Currents
Transect Map uvmap

Cross-Sections: Time-Series

Volume Scattering (470nm,117°) Volume Scattering (532nm,117°) Chlorophyll a (µg L-1) Density (kg m-3) Salinity (PSU) Temperature (°C)
sci-bb2flsv2-b470-scaled sci-bb2flsv2-b532-scaled sci-bb2flsv2-chl-scaled sea-water-density sea-water-salinity sea-water-temperature
Sound Velocity (m s-1)
speed-of-sound-in-sea-water

Cross-Sections: Distance Along Track

Volume Scattering (470nm,117°) Volume Scattering (532nm,117°) Chlorophyll a (µg L-1) Density (kg m-3) Salinity (PSU) Temperature (°C)
sci-bb2flsv2-b470-scaled sci-bb2flsv2-b532-scaled sci-bb2flsv2-chl-scaled sea-water-density sea-water-salinity sea-water-temperature
Sound Velocity (m s-1)
speed-of-sound-in-sea-water