Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
unit_167-362 CWBCS 2012-08-28
21:05 GMT
2012-08-30
20:11 GMT
1.96 91.3
km
14.97 Volts
14.00 Volts
234
minutes
Statsewich
Dobbins
6 0170 kmzs

Transects: Synoptic 1 2 3 4 5 6 7 All Latest

Transect 0: 2012-08-28 21:06 - 2012-08-30 17:32 GMT

Maps

Transect
Transect Map

Cross-Sections: Time-Series

Volume Scattering (117°) CDOM (ppb) Chlorophyll a (µg L-1) Density (kg m-3) Salinity (PSU) Temperature (°C)
sci-bbfl2s-bb-scaled sci-bbfl2s-cdom-scaled sci-bbfl2s-chlor-scaled sea-water-density sea-water-salinity sea-water-temperature
Sound Velocity (m s-1)
speed-of-sound-in-sea-water

Cross-Sections: Distance Along Track

Volume Scattering (117°) CDOM (ppb) Chlorophyll a (µg L-1) Density (kg m-3) Salinity (PSU) Temperature (°C)
sci-bbfl2s-bb-scaled sci-bbfl2s-cdom-scaled sci-bbfl2s-chlor-scaled sea-water-density sea-water-salinity sea-water-temperature
Sound Velocity (m s-1)
speed-of-sound-in-sea-water