Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
unit_159-361 CWBCS 2012-08-28
18:30 GMT
2012-09-02
01:08 GMT
4.28 57.7
km
14.84 Volts
13.24 Volts
296
minutes
Statsewich
Dobbins
7 0169 kmzs

Transects: Synoptic 1 2 3 4 5 6 7 8 9 10 11 All Latest

Transect 0: 2012-08-28 18:33 - 2012-09-01 22:47 GMT

Maps

Transect
Transect Map

Cross-Sections: Time-Series

Density (kg m-3) Salinity (PSU) Temperature (°C) Sound Velocity (m s-1)
sea-water-density sea-water-salinity sea-water-temperature speed-of-sound-in-sea-water

Cross-Sections: Distance Along Track

Density (kg m-3) Salinity (PSU) Temperature (°C) Sound Velocity (m s-1)
sea-water-density sea-water-salinity sea-water-temperature speed-of-sound-in-sea-water