Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
ru01-163 eline 2010-08-03
16:18 GMT
2010-09-01
15:15 GMT
28.96 667.4
km
15.11 Volts
10.79 Volts
1914
minutes
Aragon
Woithe
Haskins
3 0081 kmzs

Transects: Synoptic 1 2 3 4 5 6 7 8 9 10 11 All Latest

Transect 0: 2010-08-03 16:17 - 2010-09-01 14:35 GMT

Maps

Transect
Transect Map

Cross-Sections: Time-Series

Density (kg m-3) Salinity (PSU) Temperature (°C) Sound Velocity (m s-1)
sea-water-density sea-water-salinity sea-water-temperature speed-of-sound-in-sea-water

Cross-Sections: Distance Along Track

Density (kg m-3) Salinity (PSU) Temperature (°C) Sound Velocity (m s-1)
sea-water-density sea-water-salinity sea-water-temperature speed-of-sound-in-sea-water