Glider Project Deployed Recovered Days Distance Start/
End Voltage
Air Time POC Notes Payload KMZs Data Metadata
ru23-164 IOOS 2010-08-03
19:53 GMT
2010-08-28
16:00 GMT
24.84 362.7
km
12.57 Volts
11.21 Volts
2170
minutes
Aragon
Hails
Boyes
8 0121 kmzs

all Notes (9)  

Select Category: Deployment Glider All

Posted/
Updated
Category
2011-06-10 16:07 GMT
dkaragon
vehicle this is for this glider only
2010-12-02 17:15 GMT
kerfoot
configuration Science Payload:

CTD-0121
bbfl2s-667
bb3slo 645
bbam 026G
2010-08-28 06:03 GMT
haldeman
deployment RU23 aborted for high vacuum; indicative of air bladder leak. Currently drifting on surface, u_max_time_in_gliderdos 5400, callback 30 cycle. Alan Hails will attempt to arrange recovery early a.m.
2010-08-27 22:20 GMT
dkaragon
deployment use - science_super

sbd changed to reflect no science data

trying to last another week or so due to storms.
2010-08-21 17:27 GMT
dkaragon
deployment buoyancy pump abort, related to remora, likely tried to move the pump too fast and caused problems

fractured tests at surface showed it moving, have to reset system several times to get liths back online
2010-08-16 16:21 GMT
dkaragon
deployment Another GPS abort, GPS apparently working, resequenced.

Likely a surface abort again since glider was due up. Did not pull MLG.
2010-08-11 15:09 GMT
dkaragon
deployment ABORT HISTORY: total since reset: 7
ABORT HISTORY: last abort cause: MS_ABORT_DEVICE_ERROR
ABORT HISTORY: last abort time: 2010-08-11T13:50:35
ABORT HISTORY: last abort segment: ru23-2010-217-4-72 (0069.0072)
ABORT HISTORY: last abort mission: 100_TN.MI

Glider aborted for GPS too many warnings while on the surface at the end of the segment, for whatever reason. Because of this device out of service the lithium batteries did not come back online.

use + lithium would not remedy, but a single exit reset did.
2010-08-09 19:51 GMT
dkaragon
deployment 4 hour missions
2010-06-03 16:13 GMT
kerfoot
configuration Lithium ion rechargeables